Title: COMMISSION DISTRICT(S): Commission District 03 Super District 06 Application of Hollingshead Materials, LLC c/o Brian Hercules for a Special Land Use Permit (SLUP) to allow for an asphalt plant (concrete, ready-mix facility) in the M-2 (Heavy Industrial) zoning district, at 3298 and 3272 Fayetteville Road.
Attachments: 1. SLUP-25-1247295 Jan. BOC 2025 Staff Report 3298 & 3272 Fayetteville Road, 2. SLUP-25-1247295 Jan. PC 2025 Staff Report 3298 & 3272 Fayetteville Road, 3. SLUP-25-1247295 (2024-1444) Recommended Conditions

Public Hearing: YES ? NO ? Department: Planning & Sustainability

SUBJECT:
Title
COMMISSION DISTRICT(S): Commission District 03 Super District 06
Application of Hollingshead Materials, LLC c/o Brian Hercules for a Special Land Use Permit (SLUP) to allow for an asphalt plant (concrete, ready-mix facility) in the M-2 (Heavy Industrial) zoning district, at 3298 and 3272 Fayetteville Road.
Body

PETITION NO: N7-2024-1444 SLUP-25-1247295
PROPOSED USE: An asphalt plant (concrete, ready-mix facility.
LOCATION: 3298 & 3272 Fayetteville Road, Atlanta, Georgia 30316
PARCEL NO. : 15 080 05 002 & 15 080 05 013
INFO. CONTACT: John Reid, Sr. Planner
PHONE NUMBER: 404-371-2155

PURPOSE:
Application of Hollingshead Materials, LLC c/o Brian Hercules for a Special Land Use Permit (SLUP) to allow for an asphalt plant (concrete, ready-mix facility) in the M-2 (Heavy Industrial) zoning district.


RECOMMENDATION:
Recommended Action
COMMUNITY COUNCIL: Approval w/condition.

PLANNING COMMISSION: Two-Cycle Deferral.

PLANNING STAFF: Full Cycle Deferral.

STAFF ANALYSIS: Full Cycle Deferral (rev. 01.10.2025). Staff was previously recommending approval with 17 recommended conditions (see Planning Commission Staff Report attached). However, after the Planning Commission meeting the Atlanta Regional Commission (ARC) indicated that the project would have to procced through the Development of Regional Impact (DRI) review process. Asphalt plants are allowed in heavy industrial (M-2) zoning, subject to obtaining a Special Land Use Permit (SLUP) from the Board of Commissioners per Section 27-7.4 of the Zoning Ordinance. The proposed asphalt plant (Ready-mix plant) is consistent with the light and heavy industrial (M & M-2)) zoning pattern in the surrounding area which is developed with industrial uses, truck storage yards, vacant land, and an asphalt plant (HEH Paving). The Comprehensive Plan designates this site and the ...