File #: 2020-1269    Version: 1 Name:
Type: Resolution Status: Action
File created: 10/13/2020 In control: Board of Commissioners
On agenda: 2/23/2021 Final action:
Title: Commission District(s): 1 and 6 LB - Invitation No. 20-101212 Scott Candler Water Treatment Plant - Ozone Generators Design and Installation: for use by The Department of Watershed Management (DWM). Consists of the design, installation, and the commission of two (2) ozone generators, including all supporting components, to operate in parallel with two existing generators. Recommend award to the lowest, responsive and responsible bidder: Heavy Constructors, Inc. Amount Not To Exceed $7,112.900.00.
Attachments: 1. 2020-1269 Agenda Notes - mnb 1.12.21, 2. 2020-1269 UD Reccomendation mnb rvsd 1.12.21 - printed, 3. 2020-1269 Bid Tabulation (agenda) - mnb 1.12.21, 4. 2020-1269 Market Survey - mnb 1.12.21

Purchasing Type: Low Bidders (LB)                               

Public Hearing:  YES      NO                                   Department: Purchasing & Contracting                                     

 

AGENDA ITEM:

Title

Commission District(s): 1 and 6

LB - Invitation No. 20-101212 Scott Candler Water Treatment Plant - Ozone Generators Design and Installation: for use by The Department of Watershed Management (DWM). Consists of the design, installation, and the commission of two (2) ozone generators, including all supporting components, to operate in parallel with two existing generators. Recommend award to the lowest, responsive and responsible bidder: Heavy Constructors, Inc. Amount Not To Exceed $7,112.900.00.

 

Body

Information Contact: Cathryn G. Horner, Director

Phone Number: (404) 371-6334

 

PURPOSE:

Consists primarily of the provision of design services to facilitate the manufacturing of two (2) ozone generators according to specifications and the delivery and installation of those generators at the Scott Candler Water Treatment Plant. The installation of the two (2) ozone generators, will include but is not limited to: the Control Logix/Compact (PLC) change out to Allen Bradley; the connection of pipework; new power supply units, switchgear, cabling, and all instrumentation and control requirements. Lastly, services will include acceptance testing and commissioning of the new equipment with the existing equipment. Design and installation of the requested ozone generators will contribute to the continued filtration of the County’s drinking water. Two (2) bids were received.

 

RECOMMENDATION:

Recommended Action

Recommend award to the lowest, responsive and responsible bidder:

 

Heavy Constructors, Inc., 1596 Lower Roswell Road, Marietta, GA 30068

 

Amount Not To Exceed: $7,112,900.00

 

and authorize the Chief Executive Officer to execute the contract and all associated documents.

 

ADDITIONAL INFORMATION:

1. LSBE Participation:                                          20.35%

2. Mentor Protégé:                                                               Sol Construction, LLC

3. Contract Effective Date:                                          Contract Execution Date

4. Contract Expiration Date:                                          December 31, 2022

5. Funding:                                                                                    Renewal & Extension

CIP Line No. 29 (DWM - WIFIA and/or GEFA)

6. Additional Bidder:

 

    Reeves Young, LLC

    45 Peachtree Industrial Boulevard

    Sugar Hill, GA 30518