Title: Commission District(s): All LB - Invitation No. 2025-070 Indefinite Quantities Water, Sewer, and Emergency (Multiyear Contract). For use by the Department of Watershed Management (DWM) to provide means for water and sewer infrastructure repairs, replacements, and unforeseen malfunction responses. Recommend award to the lowest, responsive, and responsible bidders: Georgia Sewer and Storm, LLC; GS Construction, Inc.; Insituform Technologies, LLC; Ruby-Collins, Inc.; SAK Construction, LLC; and SD & C, Inc.: Total Amount Not To Exceed: $325,572,028.52
Attachments: 1. 2026-0927 Agenda Notes, 2. UD Recommendation, 3. Bid Tabulation
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Purchasing Type: Low Bidders (LB)                               

Public Hearing:  YES      NO                                   Department: Purchasing & Contracting                                     

 

AGENDA ITEM:

Title

Commission District(s): All

LB - Invitation No. 2025-070 Indefinite Quantities Water, Sewer, and Emergency (Multiyear Contract). For use by the Department of Watershed Management (DWM) to provide means for water and sewer infrastructure repairs, replacements, and unforeseen malfunction responses. Recommend award to the lowest, responsive, and responsible bidders: Georgia Sewer and Storm, LLC; GS Construction, Inc.; Insituform Technologies, LLC; Ruby-Collins, Inc.; SAK Construction, LLC; and SD & C, Inc.: Total Amount Not To Exceed: $325,572,028.52

 

Body

Information Contact: Michelle Butler, Chief Procurement Officer

Phone Number: (404) 687-3581

 

PURPOSE:

DWM’s Wastewater Collection and Transmission System (WCTS) includes an estimated 2,700 miles of sanitary sewer lines, and 70,000 manholes. Per the Consent Decree (CD) entered into with the United States Environmental Protection Agency (USEPA), the County must implement a program for continuous sewer assessment, maintenance and rehabilitation aimed at minimizing sanitary sewer overflows (SSOs). Sanitary sewer renewal, rehabilitation, and associated work activities will serve to improve sanitary sewer system operations. Contractors shall utilize the nationally recognized NASSCO published PACP and MACP standards for conducting all post rehabilitation inspections. The work will be performed on an on-demand basis as authorized by DWM via the use of Work Orders. Work Orders will include the approval of a contractor’s schedule.  Seven (7) bids were received.

 

RECOMMENDATION:

Recommended Action

Recommend award to the lowest, responsive, and responsible bidders:

 

Georgia Sewer and Storm, LLC, 2255 Loganville Highway, Grayson, Georgia 30017

Note:                     LSBE-MSA Prime Firm

Estimated Amount: $29,587,580.00

 

GS Construction, Inc., 6404 Buford Highway, Norcross, Georgia 30071

Note:                     LSBE Participation: 20%

Estimated Amount: $56,475,666.67

 

Insituform Technologies, LLC, 580 Goddard Avenue, Chesterfield, Missouri 63005

Note:                     LSBE Participation: 20.11%

Estimated Amount: $69,825,779.17

 

Ruby-Collins, Inc., 4875 Martin Court, Smyrna, Georgia 30082

Note:                     LSBE Participation: 20.63%

Estimated Amount: $60,775,987.67

 

SAK Construction, LLC, 864 Hoff Road, O’Fallon, Missouri 63366

Note:                     LSBE Participation: 27%

Estimated Amount: $70,202,512.50

 

SD&C, Inc., 4473 Covington Highway, Decatur, Georgia 30035

Note:                     LSBE-DeKalb Prime Firm

                     LSBE Participation: 60%

Estimated Amount: $38,704,502.52

 

Total Amount Not To Exceed: $325,572,028.52

 

and authorize the Chief Executive Officer to execute the contracts and all associated documents.

 

ADDITIONAL INFORMATION:

1. Contract Effective Date:                     Contract Execution Date

2. Contract Expiration Date:                     December 31, 2030

3. Funding:                                                               Renewal & Extension and/or Bonds

CIP Line Nos. 44, 82, and 84

4. Additional Bidder:

 Site Engineering, Inc.

 7025 Best Friend Road

 Doraville, Georgia 30340