File #: 2023-1225    Version: 1 Name:
Type: Resolution Status: Preliminary Item
File created: 9/25/2023 In control: Board of Commissioners
On agenda: 12/12/2023 Final action:
Title: Commission District(s): All RFP - Request for Proposals No. 23-500640 Design and Engineering Services Upgrade Lower Crooked Creek No. 2 (LCC 2) Pump Station: for use by the Department of Watershed Management (DWM). Consists of providing design and engineering services for the upgrade of LCC 2 Pump Station (PS), upgrade of Rogers Lake PS, and decommissioning of LCC No. 3 PS. Recommend award to the highest scoring proposer: Lakeshore Engineering, LLC. Total Amount Not to Exceed $35,593,331.00.
Attachments: 1. Agenda Notes 23-500640, 2. Cumulative Score Report, 3. UD Recommendation LR for RFP 23-500640 Lower Crooked Creek, 4. Evaluation Summary - 23-500640, 5. Market Survey 23-500640

Purchasing Type: Request for Proposals (RFP)                               

Public Hearing:  YES      NO                                   Department: Purchasing & Contracting                                     

 

AGENDA ITEM:

Title

Commission District(s): All

RFP - Request for Proposals No. 23-500640 Design and Engineering Services Upgrade Lower Crooked Creek No. 2 (LCC 2) Pump Station: for use by the Department of Watershed Management (DWM). Consists of providing design and engineering services for the upgrade of LCC 2 Pump Station (PS), upgrade of Rogers Lake PS, and decommissioning of LCC No. 3 PS. Recommend award to the highest scoring proposer: Lakeshore Engineering, LLC. Total Amount Not to Exceed $35,593,331.00.

Body

Information Contact: Michelle Butler, Procurement Manager

Phone Number: (404) 687-3581

 

PURPOSE:

Consist of providing design and engineering services for replacing the existing LCC 2 PS, demolition of the existing LCC 2 and LCC 3 PSs, upgrading or replacing the Rogers Lake PS, and connecting to the Rogers Lake PS discharge location (manifolded force main connection), and the interconnection of the LCC 2 and LCC 3 force mains (24” to 24”). These services will assist DWM with meeting the demands of the County by providing engineering services to increase the Snapfinger facility permitted capacity from forty-four (44) million gallons per day (MGD) to fifty-four (54) MGD. Three (3) proposals were received.

 

RECOMMENDATION:

Recommended Action

Recommend award to the highest scoring proposer:

 

Lakeshore Engineering, LLC, 1259 Ellsworth Drive, Atlanta, GA 30318

 

and authorize the Chief Executive Officer to execute the contracts and all associated documents.

 

Evaluation Committee Scores:

 

Firm:                     Score:

Lakeshore Engineering, LLC                     92 points

Ruby Collins, Inc.                     77 points

 

ADDITIONAL INFORMATION:

1. Contract Effective Date:                     Contract Execution

2. Contract Effective Date:                     December 31, 2027

3. Funding:                                                               Renewal and Extension

                                                                                    CIP Line No. 84 (DWM)

4. Additional Proposers:                     

    Ruby Collins, Inc.

   4875 Martin Court, SE

   Smyrna, GA 30082

 

   Reeves Young, LLC

   45 Peachtree Industrial Blvd

   Sugar Hill, GA 30518

   (Non-Responsive)