Legislation Details

File #: 2026-1463    Version: 1 Name:
Type: Resolution Status: Preliminary Item
File created: 10/5/2026 In control: Board of Commissioners
On agenda: 12/8/2026 Final action:
Title: Commission District(s): All LB – Solicitation No. 2026-064-ITB, Scott Candler Water Treatment Plant Filter Media Replacement (Multi-Year Contract). For use by Department of Watershed Management to obtain demolition and construction services to replace the Filter Media at the Scott Candler Water Treatment Plant. Recommend Award to the lowest responsive and responsible bidder, R2T, Inc.: Amount Not to Exceed: $16,470,987.72
Attachments: 1. Agenda Notes, 2. Bid Tabulation, 3. UD Recommendation Form
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Purchasing Type: Low Bidders (LB)                               

Public Hearing:  YES ☐     NO ☒                                  Department: Purchasing & Contracting                                     

 

AGENDA ITEM:

Title

Commission District(s): All

LB - Solicitation No. 2026-064-ITB, Scott Candler Water Treatment Plant Filter Media Replacement (Multi-Year Contract). For use by Department of Watershed Management to obtain demolition and construction services to replace the Filter Media at the Scott Candler Water Treatment Plant. Recommend Award to the lowest responsive and responsible bidder, R2T, Inc.: Amount Not to Exceed: $16,470,987.72

 

Body

Information Contact: Michelle Butler, Chief Procurement Officer

Phone Number: (404) 687-3581

 

PURPOSE:

This project focuses on rehabilitating the existing water filters within the plant. It is a capital improvement effort aimed at preserving reliability, performance, and regulatory compliance. The County's goal is to meet EPA maximum contaminant levels (MCL) for six per-and polyfluoroalkyl substance (PFAS) compounds by October 2029. Starting in 2027, plant systems must begin reporting PFAS levels.

Filters are vital for safe drinking water in DeKalb County.​ Assessment showed the Granular Activated Carbon (GAC) media has significantly degraded physically and lost adsorption capacity due to age and long-term use, risking filter performance and operational disruptions.​ Internal filter components (grating, ladders, underdrains, etc.) require inspection, repair, and selective replacement to ensure safety, integrity, and reliable operation.​ Upgrades will maintain regulatory compliance, support water quality goals, and preserve operational flexibility.​ This project will proactively address aging infrastructure, minimize emergency repairs, and prepare the plant for future challenges like PFAS treatment, ensuring uninterrupted service.​

 

RECOMMENDATION:

Recommended Action

Recommend Award to the lowest responsive and responsible bidder:

 

R2T, Inc., 1841 Peeler Road, Suite C, Atlanta, GA 30338

Note: Prime LSBE-DeKalb Firm

 

Total Amount Not To Exceed $16,470,987.72

 

and authorize the Chief Executive Officer to execute all necessary documents.

 

ADDITIONAL INFORMATION:

1. Contract Effective Date:                      Date of Contract Execution

2. Contract Expiration Date:                     December 31, 2030

3. Funding:                                                               Enterprise and/or Bond      

CIP Line Nos. 512 and 513

 

 

4. Additional Bidders:

 

​Reeves Young, LLC

45 Peachtree Industrial Blvd. NW

Sugar Hill, GA, 30518

 

Ruby-Collins, Inc.

4875 Martin Court, SE

Smyrna, GA 30082

 

Tech Coat, Inc.

4310 Greenway Drive

Knoxville, TN 37918

 

Rehab Construction Co., Inc.

2246 Bethel Road

Conyers, GA 30012

(Non-Responsive)