Legislation Details

File #: 2026-0950    Version: 1 Name:
Type: Resolution Status: Preliminary Item
File created: 5/22/2026 In control: Board of Commissioners
On agenda: 6/23/2026 Final action:
Title: Commission District(s): 3, 6 RFQ - Request for Qualifications (RFQ) 23-500646, Design Services for South River Trail Phase VI (PI#0017809). For use by Public Works - Transportation (PW-T) to obtain design services for South River Trail Phase VI from near Boulder Walk Drive and Intrenchment Creek to Crestdale Circle. Recommend award to the highest scoring proposer: Kimley-Horn & Associates, Inc.: Amount Not To Exceed: $3,124,930.28.
Attachments: 1. Agenda Notes, 2. SPLOST UD Rec Form, 3. Cumulative Score Report - SRTVI, 4. Summary Comments
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Purchasing Type: Request for Proposals (RFP)                               

Public Hearing:  YES      NO                                   Department: Purchasing & Contracting                                     

 

AGENDA ITEM:

Title

Commission District(s): 3, 6

RFQ - Request for Qualifications (RFQ) 23-500646, Design Services for South River Trail Phase VI (PI#0017809).  For use by Public Works - Transportation (PW-T) to obtain design services for South River Trail Phase VI from near Boulder Walk Drive and Intrenchment Creek to Crestdale Circle.  Recommend award to the highest scoring proposer: Kimley-Horn & Associates, Inc.: Amount Not To Exceed: $3,124,930.28.

Body

 

Information Contact: Michelle Butler, Chief Procurement Officer

Phone Number: (404) 687-3581

 

PURPOSE:

Consists of providing an approved concept report, preliminary construction plans, signing and marking plans, signal plans, bridge plans, final right-of way plans (including revision), erosion control plans, staging plans, and final construction plans (including revisions through project final acceptance) and includes all required engineering studies. All deliverables shall be in accordance with but not limited to the Plan Development Process (PDP), Electronic Data Guidelines, Plan Presentation Guide, NEPA and the GDOT Environmental Procedure Manual, GDOT Design Policy Manual, GDOT Drainage Manual, and the GDOT Bridge and Structures Design Manual. Six (6) proposals were received.

 

RECOMMENDATION:

Recommended Action

Recommend award to the highest scoring proposer:

 

Kimley-Horn & Associates, Inc., 3930 East Jones Bridge Road; Suite 350, Peachtree Corners, GA 30092

 

Amount Not To Exceed: $3,124,930.28

 

and authorize the Chief Executive Officer to execute the contract and all associated documents.

 

Evaluation Committee Scores:

 

Firm/Phase:                                                                                                                                                   Scores:

Keck + Wood                                                                                                                                                    875

Kimley-Horn & Associates                                                               1000

Pond & Company                                                                                                                               850

Prime Engineering, Inc.                                                                                     725

Axis Infrastructure                                                                                                          300

 

 

After evaluation of technical proposals, the recommendation is to award to the highest scoring proposer

 

ADDITIONAL INFORMATION:

1. Contract Effective Date:                                                                                    Date of Execution

2. Contract Expiration Date:                                                                                    December 31, 2032

3. Funding:                                                                                                                              $   640,000.00  - Federal (GDOT)

                                                                                                                                                   $2,484,930.28  - SPLOST

4. Additional Bidders:

 

Prime Engineering, Inc.

3715 Northside Parkway NW

Bldg 300; Ste 200

Atlanta, GA  30327

 

Pond & Company

3500 Parkway Lane; Ste 500

Peachtree Corners, GA  30092

 

Bridgefarmer & Associates, Inc.

419 East Crossville Rd; Ste 208

Roswell, GA 30075

 

Keck & Wood, Inc.

3090 Premiere Pkwy, Ste 200

Duluth, GA  30097

 

Axis Infrastructure

70 Mansell Ct., Ste 200

Roswell, GA 30076