File #: 2018-2263    Version: 1 Name:
Type: Resolution Status: Preliminary Item
File created: 6/13/2018 In control: Board of Commissioners
On agenda: 8/14/2018 Final action: 8/14/2018
Title: Commission District(s): 1 and 6 RFP - Request for Proposals No. 17-500472 Design Build Services for Scott Candler Water Treatment Plant - High Services Pump Station (HSPS) Header & Transfer Pumps Replacement: for use by the Department of Watershed Management (DWM). Consists of providing the design and construction services to remove and replace the transfer pump station's main intake header, which is showing severe signs of corrosion, and to include the removal and replacement of four (4) small transfer pumps with two (2) large transfer pumps. Recommend award to the sole proposer, who is responsive and responsible: Reeves Young, LLC. Amount Not To Exceed: $3,961,915.00.
Attachments: 1. Agenda Notes, 2. User Department Recommendation, 3. Cumulative Score Report, 4. Market Survey

Purchasing Type: Request for Proposals (RFP)                               

Public Hearing:  YES      NO                                   Department: Purchasing & Contracting                                     

 

AGENDA ITEM:

Title

Commission District(s): 1 and 6

RFP - Request for Proposals No. 17-500472 Design Build Services for Scott Candler Water Treatment Plant - High Services Pump Station (HSPS) Header & Transfer Pumps Replacement: for use by the Department of Watershed Management (DWM). Consists of providing the design and construction services to remove and replace the transfer pump station’s main intake header, which is showing severe signs of corrosion, and to include the removal and replacement of four (4) small transfer pumps with two (2) large transfer pumps. Recommend award to the sole proposer, who is responsive and responsible: Reeves Young, LLC. Amount Not To Exceed: $3,961,915.00.

 

Body

Information Contact: Talisa Clark, CPPO

Phone Number: (404) 687-2797

 

PURPOSE:

Consists of providing the design and construction services to remove and replace the Scott Candler Water Treatment Plant HSPS No. 1 existing main intake header, which is showing severe signs of corrosion. Services also include, the removal of four (4) small 5,000 gallons per minute (gmp) axial transfer pumps and replacing them with two (2) large 15,500 Variable Frequency Drive (VFD) transfer pumps to increase the efficiency and capacity of the water distribution system. One (1) proposal was received.

 

RECOMMENDATION:

Recommended Action

Recommend award to the sole proposer:

 

Reeves Young, LLC, 25 Peachtree Industrial Boulevard, Suite 200, Gwinnett, GA 30518

 

Amount Not To Exceed: $3,961,915.00

 

and authorize the Chief Executive Officer to execute the contract and all associated documents.

 

Evaluation Committee Score:

 

Firm:                                                                                                                              Score:

Reeves Young, LLC                                                                                       92                     

 

After the evaluation of the technical and cost proposal, the recommendation is to award to the sole proposer, who is responsive and responsible.

 

 

                     

ADDITIONAL INFORMATION:

1. LSBE Participation:                                       20%

2. Contract Effective Date:                                Date of Award

3. Contract Expiration Date:                              December 31, 2020

4. Funding:                                                                                      2011 Bond and Renewal & Extension

                                                                           CIP Line No. 29 (DWM)