Title: Commission District(s): 3 and 6 Application of Director of Planning & Sustainability to rezone property from Tier 4a of the Bouldercrest Overlay District within the Soapstone Historic District with an underlying M (Industrial) zoning district to Tier 5 of the Bouldercrest Overlay District within the Soapstone Historic District with an underlying R-100 (Residential Medium Lot-100) zoning district, at 1670 Henrico Road.
Attachments: 1. Z-26-1248109 08.13.2026 BOC Staff Report 1670 Henrico Road, 2. Z-26-1248109 07.26 PC Staff Report 1670 Henrico Road

Public Hearing: YES ? NO ? Department: Planning & Sustainability

SUBJECT:
Title
Commission District(s): 3 and 6
Application of Director of Planning & Sustainability to rezone property from Tier 4a of the Bouldercrest Overlay District within the Soapstone Historic District with an underlying M (Industrial) zoning district to Tier 5 of the Bouldercrest Overlay District within the Soapstone Historic District with an underlying R-100 (Residential Medium Lot-100) zoning district, at 1670 Henrico Road.
Body

PETITION NO: N8-2026-0825 Z-26-1248109
PROPOSED USE: Tier 5 of the Bouldercrest Overlay District.
LOCATION: 1670 Henrico Road, Conley, Georgia 30288
PARCEL NO. : 15 046 01 004
INFO. CONTACT: John Reid, Sr. Planner
PHONE NUMBER: 404-371-2155

PURPOSE:
Application of Director of Planning & Sustainability to rezone property from Tier 4a of the Bouldercrest Overlay District within the Soapstone Historic District with an underlying M (Industrial) zoning district to Tier 5 of the Bouldercrest Overlay District within the Soapstone Historic District with an underlying R-100 (Residential Medium Lot-100) zoning district.


RECOMMENDATION:
Recommended Action
COMMUNITY COUNCIL: (June 2026) Full-Cycle Deferral.

PLANNING COMMISSION: (July 2026) Three-Cycle Deferral.

PLANNING STAFF:(08.13.2026 BOC) Withdrawal without Prejudice_rev. 07.30.2026

STAFF ANALYSIS: The BOD was adopted by the Board of Commissioners on March 22, 2013. The two primary industrial tiers include Tier 4 and Tier 4a. Tier 4A of the BOD is the industrial area along the east side of I-675 and west of the existing Georgia Power Overhead Utility Easement located south of I-285 and north of Cedar Grove Road. Because Tier 4A is only separated from residential neighborhoods by the utility easement, uses and standards are more stringent in this tier. Tier 4a is adjacent to Tier 5 which is a single-family residential tier to the east and, at...