File #: 2019-3655    Version: Name:
Type: Resolution Status: Preliminary Item
File created: 4/22/2019 In control: Board of Commissioners
On agenda: 6/25/2019 Final action:
Title: Commission District(s): All CO - Change Order No. 1 to Contract No. 1063831 Annual Water and Sewer Construction (Annual with 2 Options to Renew): for use by the Department of Watershed Management (DWM). This contract consists of installation and repair of water and sewer pipes, valve installations, construction in a right of way, manholes and structures, sewer bypass systems, restoration of streets, erosion control, and shoring techniques, to include traffic control safety, which meet OSHA requirements. This request will add additional funding and scope of work to assist in completing approximately 100,000 linear feet (LF) of Cured-In-Place Pipe (CIPP) lining, point repair, and restoration. The additional scope of work will assist in expediting the completion of the Priority Areas Sewer Assessment and Rehabilitation Program (PASARP) Consent Decree Rehabilitation Work. Awarded to Granite Inliner, LLC. Amount Not To Exceed: $9,621,083.00.
Attachments: 1. Agenda Notes, 2. User Department Change Order Request No. 1, 3. DWM price comparison against Rockdale's cooperative agreement
Purchasing Type: Change Order (CO)
Public Hearing: YES ? NO ? Department: Purchasing & Contracting

AGENDA ITEM:
Title
Commission District(s): All
CO - Change Order No. 1 to Contract No. 1063831 Annual Water and Sewer Construction (Annual with 2 Options to Renew): for use by the Department of Watershed Management (DWM). This contract consists of installation and repair of water and sewer pipes, valve installations, construction in a right of way, manholes and structures, sewer bypass systems, restoration of streets, erosion control, and shoring techniques, to include traffic control safety, which meet OSHA requirements. This request will add additional funding and scope of work to assist in completing approximately 100,000 linear feet (LF) of Cured-In-Place Pipe (CIPP) lining, point repair, and restoration. The additional scope of work will assist in expediting the completion of the Priority Areas Sewer Assessment and Rehabilitation Program (PASARP) Consent Decree Rehabilitation Work. Awarded to Granite Inliner, LLC. Amount Not To Exceed: $9,621,083.00.

Body
Information Contact: Talisa Clark, CPPO
Phone Number: (404) 687-2797

PURPOSE:
Awarded by the BOC on May 23, 2017 for an amount not to exceed $9,000,000.00. On July 24, 2018 the BOC approved the 1st renewal option for an amount not to exceed $9,000,000.00. This request is to add additional funding and PASARP related scope of work to include: Cured-In-Place Pipe (CIPP) lining (flexible tube and fiberglass) with ultra-violet light and steam curing; service lateral reconnection and replacement; point repairs; and site restoration. The requested funding and scope of work is limited to this change order and is not meant to alter the existing Annual Water and Sewer contract. The renewal of the Annual Water and Sewer work is being requested in a separate agenda item. This change order will allow Granite Inliner, LLC to assist i...

Click here for full text