File #: 2022-1071    Version: 1 Name:
Type: Resolution Status: Action
File created: 1/6/2022 In control: Board of Commissioners
On agenda: 2/8/2022 Final action:
Title: Commission District(s): All RFP - Request for Proposals No. 20-500550 Construction Management Services (Multiyear Contract): for use by the Department of Watershed Management (DWM). Consists of providing on-call construction management services that include pre-construction services, construction inspection, field services, management of meetings, production of progress reports and other related services for water and sewer projects. Request to rescind Agenda Item 2021-3015 and award to the three (3) highest scoring proposers: CGA Solutions [Joint Venture of Corporate Environmental Risk Management, LLC (CERM)/Gresham Smith/Atkins North America, Inc.], Tetra Tech, Inc., and EDT-Wade Trim-Reeves JV [Joint Venture of Engineering Design Technologies, Inc. (EDT)/Wade Trim, Inc./RK Reeves and Associates, Inc.]. Total Amount Not to Exceed $24,743,700.00.
Attachments: 1. Substitute 2022 02.08 Item 2022-1071, 2. 2021-3015 Agenda Item Packet

Substitute

Purchasing Type: Rescission (RES)                               

Public Hearing:  YES      NO                                   Department: Purchasing & Contracting                                     

 

AGENDA ITEM:

Title

Commission District(s): All

RFP - Request for Proposals No. 20-500550 Construction Management Services (Multiyear Contract): for use by the Department of Watershed Management (DWM). Consists of providing on-call construction management services that include pre-construction services, construction inspection, field services, management of meetings, production of progress reports and other related services for water and sewer projects. Request to rescind Agenda Item 2021-3015 and award to the three (3) highest scoring proposers: CGA Solutions [Joint Venture of Corporate Environmental Risk Management, LLC (CERM)/Gresham Smith/Atkins North America, Inc.], Tetra Tech, Inc., and EDT-Wade Trim-Reeves JV [Joint Venture of Engineering Design Technologies, Inc. (EDT)/Wade Trim, Inc./RK Reeves and Associates, Inc.]. Total Amount Not to Exceed $24,743,700.00.

 

Body

Information Contact: Cathryn G. Horner, Chief Procurement Officer

Phone Number: (404) 371-6334

 

PURPOSE:

Consists of providing on-call construction management services. This will include, but is not limited to, the
following activities: pre-construction services, construction inspection, field services, management of meetings,
production of progress reports and other related services for water and sewer projects within the County’s
Capital Improvement Plan (CIP). These contracts will assist DWM with meeting the demands of the County by
providing construction management services for various CIP construction projects. Nine (9) proposals were
received.

On October 26, 2021, the BOC awarded Agenda Item 2021-3015 to the three (3) highest scoring proposers. A
review of the records indicates that the estimated not to exceed amounts were transposed for two (CGA
Solutions and Tetra Tech) of the three proposers.

This request is to:
1. Rescind the award made under 2021-3015.
2. Award Request for Proposals No. 20-500550 as requested within the User Department Recommendation and
herein.

 

RECOMMENDATION:

Recommended Action

Rescind award and Recommend award to the three (3) highest scoring proposers:

 

CGA Solutions [Joint Venture of Corporate Environmental Risk Management, LLC (CERM)/Gresham

Smith/Atkins North America, Inc.], 1990 Lakeside Parkway Suite 300, Tucker, Georgia 30084

Note: Prime LSBE-DeKalb

LSBE Participation: 20%

Estimated Amount Not to Exceed: $8,606,250.00

 

Tetra Tech, Inc., 1899 Powers Ferry Road, Suite 400, Atlanta, Georgia 30339

Note: LSBE Participation: 53%

Estimated Amount Not to Exceed: $8,953,950.00

 

EDT-Wade Trim-Reeves JV [Joint Venture of Engineering Design Technologies, Inc. (EDT)/Wade Trim,

Inc./RK Reeves and Associates, Inc.], 1705 Enterprise Way Suite 200, Marietta, Georgia 30067

Note: Prime LSBE-DeKalb

LSBE Participation: 2%

Estimated Amount Not to Exceed: $7,183,500.00

 

Total Amount Not to Exceed: $24,743,700.00

 

and authorize the Chief Executive Officer to execute the contracts and all associated documents.

 

 

Evaluation Committee Scores:

 

Firm:                                                                                                                                            Score:

Tetra Tech, Inc.                                                                                                                                              91 points

CGA Solutions Joint Venture                                                                                                              88 points

[CERM/Gresham Smith/Atkins North America]                      

EDT-Wade Trim-Reeves JV [Engineering Design                                                                  86 points

Technologies, Inc. (EDT)/Wade Trim, Inc./RK Reeves

and Associates, Inc.]

Wood Environment & Infrastructure Solutions, Inc.                           83 points

North American Pipeline Management (NAPM)                                                82 points

Arcadis U.S., Inc.                                                                                                                          79 points

Volkert, Inc.                                                                                                                                                                           79 points

Black & Veatch, Inc.                                                                                                                                                      73 points

Hellier Group, LLC                                                                                                                                                     69 points

 

After the evaluation of technical and cost proposals, the recommendation is to award to the three (3) highest scoring proposers.

 

 

ADDITIONAL INFORMATION:

1. Contract Effective Date:                                           Contract Execution

2. Contract Expiration Date:                                           December 31, 2026

3. Funding:                                                                                     Renewal and Extension and/or Bonds, Various CIP Line Nos. (DWM)

4. Justification:                                                                Original awarded estimated not to exceed amounts were