Meeting Details

Meeting Name: PWI-Public Works & Infrastructure Committee Agenda status: Final
Meeting date/time: 6/26/2023 11:00 AM Minutes status: Final  
Meeting location:
Special Called Meeting
Published agenda: Agenda Agenda Published minutes: Minutes Minutes Meeting Extra2: Not available  
Agenda packet: Not available
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
2023-0225 1  ResolutionCommission District(s): All CO - Change Order No. 1 to Contract No. 1283955 Cooperative Agreement for Consent Decree: Trenchless Technology Rehabilitation, External Point Repairs, and Related Products and Services (OMNIA Partners Cooperative Purchasing Agreement No. R170802) [DeKalb Cooperative Agreement]: for use by Department of Watershed Management (DWM). This contract consists of providing sewer system trenchless sewer line rehabilitation services. This request is to increase the contract scope of work, funding, and term through October 31, 2024. Additionally, this request seeks to approve a 5% maximum cost escalation for work completed from January 2023 going forward. Awarded to SAK Construction, LLC. Amount Not To Exceed: $13,829,333.45.recommended for approval.Pass Action details Not available
2023-0426 1  ResolutionCommission District(s): All RFP - Request for Proposals No. 22-500630 Design and Engineering Services During Construction for Snapfinger Advanced Wastewater Treatment Facility Expansion - Phase 3A Project: for use by the Department of Watershed Management (DWM). Consists of providing design and engineering services under the Construction for Snapfinger Advanced Wastewater Treatment Facility Expansion - Phase 3A Project. Recommend award to the highest scoring proposer: CDM Smith, Inc. Amount Not to Exceed: $6,273,240.00.recommended for approval.Pass Action details Not available
2023-0188 1  ResolutionCommission District(s): 3 and 7 CO - Change Order No. 5 to Contract No. 13-902684 Construction Management (CM) Services for Snapfinger Creek Advanced Wastewater Treatment Plant Expansion - Phase II: for use by the Department of Watershed Management (DWM). This contract consists of providing construction management services for the Snapfinger Advanced Wastewater Treatment Facilities Expansion - Phase II. This request is to increase funds and the contract term through December 31, 2024. Awarded to Tetra Tech, Inc. Amount Not To Exceed: $2,781,477.40.recommended for approval.Pass Action details Not available
2023-0226 1  ResolutionCommission District(s): 3 and 7 CO - Change Order No. 15 to Contract No. 972548 Snapfinger Advanced Wastewater Treatment Facilities Expansion - Phase 2: for use by the Department of Watershed Management (DWM). This contract consists of the phase 2 expansion to the Snapfinger Advanced Wastewater Treatment Facility; inclusive of site preparation, modification of existing structures, and the construction of new structures. This request is to increase funding to allow for the completion of three (3) changes. Awarded to Archer Western Construction, LLC. Amount Not to Exceed $525,000.00.recommended for approval.Pass Action details Not available
2023-0485 1  ResolutionCommission District(s): All REN - Contract Nos. 1252356 and 1324813 Disaster Recovery and Sewage Cleaning Services (Annual Contract - 2nd Renewal of 2 Options to Renew): for use by the Department of Watershed Management (DWM) and Facilities Management (FM). These contracts consist of providing disaster recovery cleaning services of water and sewage and supplementary services for repair to systems affected by spills from heating, ventilation, air conditioning, and plumbing. This request seeks to exercise the 2nd renewal option through June 30, 2024. Awarded to Belfor USA Group and Wilpro Enterprises, Inc. dba Servpro (Wilpro). Total Amount Not To Exceed: $1,079,811.95.recommended for approval.Pass Action details Not available
2023-0305 1  ResolutionCommission District(s): All RFP - Request for Proposals No. 22-500627 Catch Basin Cleaning Services (Annual Contract with 3 Options to Renew): for use by Public Works - Roads & Drainage (R&D). Consists of providing cleaning services for catch basins and associated storm water systems. Recommend award to all proposers: Metals & Materials Engineers, LLC, EnviroWaste Services Group, Inc., Pateco Services, LLC, and Sweeping Corporation of America, Inc. Total Amount Not To Exceed: $1,300,000.00.recommended for approval.Pass Action details Not available
2023-0639 1  ResolutionCommission District(s): 5 & 7 CO - Change Order No. 1 to Contract No. 1294284 Bridge Rehabilitation Project on Park Drive: for use by Public Works - Roads and Drainage (R&D). This contract consists of rebuilding and rehabilitation of the bridge on Park Drive. This request seeks to revise the scope of work and to increase the contract funds and term through September 30, 2024. Awarded to E & D Contracting Services, Inc. Amount Not To Exceed $500,000.00.recommended for approval.Pass Action details Not available
2023-0684 1  ResolutionCommission District(s): 1 and 7 Acceptance of Funds from the Georgia Department of Transportation for Design of Pedestrian Improvements on Pleasantdale Road (PI # 0019623)recommended for approval.Pass Action details Not available
2023-0685 1  ResolutionCommission District(s): 3, 6 and 7 Acceptance of Funds from the Georgia Department of Transportation for Design of Sidewalk Improvements on Flat Shoals Parkway (SR 155) (PI # 0019622)recommended for approval.Pass Action details Not available
2023-0622 1  ResolutionCommission District(s): ALL RFVQ - Request for Vendor Qualifications No. 22-500603 Cedar Grove Road Bridge Replacement - Design Build (Multiyear Contract): for use by Public Works-Transportation. Consists of design and construction services in support of: (1) the demolition of the existing 3 - span bridge that spans the Norfolk Southern (NS) tracks; (2) construction of a 1-span bridge spanning over existing and future NS tracks; and (3) reconstruction of Cedar Grove Road approaching and departing the bridge. Recommend award to the sole, responsive and responsible proposer: C.W. Matthews Contracting Company, Inc. Amount Not To Exceed: $12,165,731.00.00.recommended for approval.Pass Action details Not available
2023-0525 1  ResolutionCommission District(s): ALL CA - Cooperative Agreement for Class 4-8 Chassis with Related Equipment, Accessories, and Services (Sourcewell Contract): for use by public Works-Fleet Management to be used by Public Works-Sanitation. Consists of piggybacking off the competitively let Sourcewell Contract No. 060920-PMC to purchase twelve (12) truck tractors with CNG engines. To be used to collect and transport collected refuse from transfer stations to the Seminole Road Landfill. Awarded to Peterbilt of Atlanta, LLC. Amount Not To Exceed: $3,358,704.00.recommended for deferralPass Action details Not available
2023-0640 1  ResolutionCommission District(s): ALL REN - Contract No. 1260316 Rock Crushing (Annual Contract - 2nd Renewal Option of 2 Options to Renew): for use by Public Works - Sanitation. This contract consists of crushing rock, granite, stone, and hauling materials to and from the Seminole Road Landfill. This request seeks to exercise the 2nd renewal option through July 31, 2024. Awarded to K&T Installers, LLC. Amount Not To Exceed: $50,000.00.recommended for approval.Pass Action details Not available
2023-0647 1  ResolutionCommission District(s): ALL EM - Odor Mitigation at Seminole Road Landfill (Emergency): for use by Public Works -Sanitation. Consists of the installation of temporary and permanent vegetation cover for stabilization and odor mitigation at the Seminole Road Landfill. This request seeks to ratify an emergency purchase. Awarded to Brown Management Services Enterprise Inc. Amount Not To Exceed: $118,500.00.recommended for approval.Pass Action details Not available
2023-0680 1  ResolutionCommission District(s): All DeKalb County Commission Districts A Resolution to Update the DeKalb County Traffic Calming Programrecommended for deferralPass Action details Not available