File #: 2022-2103    Version: 1 Name:
Type: Resolution Status: Action
File created: 8/22/2022 In control: Board of Commissioners
On agenda: 12/13/2022 Final action:
Title: Commission District(s): 2 and 6 CO - Change Order No. 1 to Contract No. 1272696 Reindeer Drive Water Main Replacement (Multiyear Contract): for use by the Department of Watershed Management (DWM). Consists of the removal of existing galvanize pipe and asbestos cement water mains; abandonment of a steel main; construction and installation of ductile iron pipe (DIP) watermains; and removal and replacement of fire hydrants. This request is to increase the scope of work, funding, and the contract term through June 30, 2024, to allow for completion of additional work. Awarded to GS Construction, Inc. Amount Not To Exceed: $15,344,809.70.
Attachments: 1. Substitute 2022 12.13 Item 2022-2103, 2. 2022-2103 Agenda Notes, 3. 2022-2103 UD CO1 Request
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
12/13/20221 Board of Commissioners approved substitute submitted from the floorPass Action details Meeting details Video Video
11/15/20221 PWI-Public Works & Infrastructure Committee recommended for approval upon receipt of additional informationPass Action details Meeting details Not available
11/15/20221 Board of Commissioners deferred to the next meetingPass Action details Meeting details Video Video
11/8/20221 Board of Commissioners deferred to the next meetingPass Action details Meeting details Video Video
11/3/20221 PWI-Public Works & Infrastructure Committee recommended holding in committeePass Action details Meeting details Not available
11/1/20221 Committee of the Whole Accepted to the BOC agenda and assigned  Action details Meeting details Not available
Substitute
Purchasing Type: Change Order (CO)
Public Hearing: YES ? NO ? Department: Purchasing & Contracting

AGENDA ITEM:
Title
Commission District(s): 2 and 6
CO - Change Order No. 1 to Contract No. 1272696 Reindeer Drive Water Main Replacement (Multiyear Contract): for use by the Department of Watershed Management (DWM). Consists of the removal of existing galvanize pipe and asbestos cement water mains; abandonment of a steel main; construction and installation of ductile iron pipe (DIP) watermains; and removal and replacement of fire hydrants. This request is to increase the scope of work, funding, and the contract term through June 30, 2024, to allow for completion of additional work. Awarded to GS Construction, Inc. Amount Not To Exceed: $15,344,809.70.
Body

Information Contact: Michelle Butler, Procurement Manager
Phone Number: (404) 687-3581

PURPOSE:
Awarded by the BOC November 9, 2021, for an amount not to exceed $10,682,365.00. This contract consists of removal of existing 2-inch to 6-inch galvanized pipe and asbestos cement watermains; construction and installation of approximately 18,300 linear feet of new 8-inch DIP watermains and approximately 3,600 linear feet of new 16-inch DIP watermains; and removal and replacement of all fire hydrants, valves, service lines and appurtenances. Residential properties have been experiencing failures and service interruptions due to pipelines not performing at the minimum required service levels. The watermain replacements needed under the Shepherds Lane and Woodland Hills Drive Water Main Replacement project (Reindeer Phase II) includes, but is not limited to, replacement of 6-inch asbestos cement pipe with the installation of 18,100 liner feet of 8-inch DIP and 13,300 linear feet of 12-inch DIP. The watermains located within this project site have exceeded their useful life and have experienced over 43 recorded breaks with...